Project involved building a new school building within the grounds of the existing school. The proposed development site included several trees along the site boundary, which contained several good quality specimens. These boundary trees were to be retained and required tree protection measures during the construction phase. An Arboricultural Survey was undertaken and an Arboricultural Impact Assessment was produced showing tree removal and tree protection measures for the retained trees.
Arboricultural Services Provided:
BS5837 Tree Survey
Arboricultural Impact Assessment
Tree Protection Plan